Graduation project: a prototype system for Dam & Reservoir Operation
A suggested project idea derived from the application's record in the encyclopedia, not a completed project. Decides release volumes from dams to balance irrigation, electricity and flood protection.
Objectives: Build a prototype that addresses the problem: Fixed operating rules do not adapt to changing climate and demand. Evaluate it with suitable metrics and compare it with a simple baseline.
Methodology: An inflow forecasting model, a reservoir simulation, then optimisation of release rules with an evolutionary algorithm or reinforcement learning.
Suggested models: Long Short-Term Memory, Deep Q-Network (DQN)
